IPO Trending
SATTVAENGGSME / NSEListed
Sattva Engineering Construction

Sattva Engineering Construction Limited (SECL), incorporated in December 2005 and based in Chennai, is an EPC company with over 40 years of experience in water infrastructure, wastewater management, and industrial construction. Recognized as a leading Class I contractor, it works closely with government bodies such as the Tamil Nadu PWD and CMWSSB. SECL provides end-to-end EPC solutions across water and wastewater projects, industrial and civil infrastructure, and residential developments, including treatment plants, pumping stations, warehouses, factory buildings, and multi-storeyed apartments. Its notable clients include CMWSSB, TWAD, PWD, Greater Chennai Corporation, Southern Railway, and BHEL.

₹70 - ₹75198.25x sub
Listed Price₹95.10
Listing Gain+26.80%

IPO Schedule & Timeline

Bookbuilding IPO
Open26 Aug 2025
Close29 Aug 2025
Allotment01 Sep 2025
Listing03 Sep 2025

Quota Reservation & Application Lots

Quota Reservation (% Shares)

Anchor13,29,600 shares
28.19%
QIB8,88,000 shares
18.83%
HNI6,91,200 shares
14.65%
Retail15,68,000 shares
33.24%
Market Maker2,40,000 shares
5.09%

Minimum Application Lots

Retail2 Lots (3,200 shares)
₹2,40,000
sHNI3 Lots (4,800 shares)
₹3,60,000
bHNI9 Lots (14,400 shares)
₹10,80,000

Company Promoters

Santhanam SeshadriR SekarJagachchandarr Sekar Uthra

Company Background

Sattva Engineering Construction Limited (SECL), incorporated in December 2005 and based in Chennai, is an EPC company with over 40 years of experience in water infrastructure, wastewater management, and industrial construction. Recognized as a leading Class I contractor, it works closely with government bodies such as the Tamil Nadu PWD and CMWSSB. SECL prov...

Financial Performance

Figures in ₹ Crores
Metric Breakdown

Revenue

Latest (Mar-25)₹94.85 Cr
Growth+13.0%
Revenue Trend (₹ in Crores)
0.036.472.7109.1Mar-23Mar-24Mar-25
PeriodRev (Cr)PAT (Cr)AssetsDebt
Mar-2594.859.14114.8236.17
Mar-2477.444.5687.4832.20
Mar-2383.931.0483.3832.24

Key Performance Indicators (KPIs)

PeriodEPSROEROCEP/E (Pre)P/E (Post)
Mar-257.6427.10%28.58%10.4614.34
Mar-244.1520.98%22.14%00
Mar-230.945.48%14.08%00

Peer Comparison & Valuation

Financial Performance

Sattva Engineering & Construction Limited

NAV/Share (₹)34.05
RONW(%)27.10
EPS (Basic) (₹)7.64

EMS Limited

NAV/Share (₹)175.7
RONW(%)20.66
EPS (Basic) (₹)33.05

Enviro Infra Engineers Limited

NAV/Share (₹)56.66
RONW(%)27.58
EPS (Basic) (₹)11.76

VA Tech Wabag Limited

NAV/Share (₹)284.8
RONW(%)14.86
EPS (Basic) (₹)47.48

Valuation

Sattva Engineering & Construction Limited

P/E(X)NA
CMP* (₹)NA
Face value (₹)10

EMS Limited

P/E(X)18.23
CMP* (₹)602.4
Face value (₹)10

Enviro Infra Engineers Limited

P/E(X)21.5
CMP* (₹)252.89
Face value (₹)10

VA Tech Wabag Limited

P/E(X)33.4
CMP* (₹)1585.7
Face value (₹)10

Broker & Analyst Reviews

Review Not Available

Institutional broker reviews and analyst reports have not been released for this issue yet. Reviews are typically published 2 to 3 days prior to the issue opening date.

IPO Allotment & Registrar Status

Official Registrar: Link Intime India Private Ltd (MUFG)

Allotment Finalized
Allotment Date
01 Sep 2025
Official Status
Out / Finalized
Registrar
Link Intime India Private Ltd (MUFG)
Listing Date
03 Sep 2025

Official Allotment Verification Links

Official Registrar Portal
Link Intime India Private Ltd (MUFG)

Direct allotment verification on the official registrar portal appointed for Sattva Engineering Construction. Check with PAN or Application No.

Check on Registrar Portal
Stock Exchange Portal
BSE India Investor Portal

Official Bombay Stock Exchange investor verification channel using Issue Name and PAN Number.

Check on BSE India

Allotment Schedule & Milestones

IST
1. Allotment Finalization01 Sep 2025Basis of allotment declared
2. Refund Initiation1 day post allotmentUPI / ASBA mandate unblocked
3. Demat CreditPrior to listingShares credited to CDSL/NSDL
4. Listing Date03 Sep 2025Trading commences on exchange

How to Check Sattva Engineering Construction Allotment Online

1Open Portal

Click on the official registrar link or BSE portal button above.

2Select Company

Select Sattva Engineering Construction from the issue drop-down list.

3Enter Details

Select PAN, Application No., or DP Client ID and type your details.

4View Allocation

Click Submit to check your allotted share count and status.

Prospectus & Official Filings

Allotment FAQs & Help

About Sattva Engineering Construction IPO

Complete issue overview for Sattva Engineering Construction (SATTVAENGG) IPO. The issue features an equity share price band of ₹70 – ₹75 per share with a minimum retail lot size of 1600 Shares (minimum application amount of ₹1,20,000). Explore live market tracking on our GMP Tracker, compare against All IPO GMP Today, or view category bidding on the Subscription Page. Verify official allotment via IPO Registrars or review participating investment bankers in our Lead Managers Directory.

Frequently Asked Questions