IPO Trending
E2ERAILSME / NSEListed
E to E Transportation Infrastructure

E To E Transportation Infrastructure Limited, incorporated in 2010, is an ISO 9001:2015 certified company providing system integration and engineering solutions for the railway sector across mainline, urban transit, and private siding projects. The company offers end-to-end services including signaling and telecommunications, overhead electrification, track projects, system integration, private sidings, and engineering design, covering design, procurement, installation, and testing. It has executed projects for Indian Railways, public sector undertakings, private rail sidings, and infrastructure developers, with key works including CBTC signaling for Hyderabad and Nagpur Metro, S&T modernization for Vizag Steel Plant and NUPPL Power Plant, interlocking upgrades on the Hosur–Salem section, siding expansion at Gujarat Pipavav Port, and platform screen door installations for Mumbai Metro Line 3 and Chennai Metro Phase 1. As of June 30, 2025, the company had an order book of 49 ongoing contracts valued at ₹43,964.38 lakh, supported by a workforce of 425 full-time employees as of July 31, 2025.

₹164 - ₹174527.76x sub
Listed Price₹330.60
Listing Gain+90.00%

IPO Schedule & Timeline

Bookbuilding IPO
Open26 Dec 2025
Close30 Dec 2025
Allotment31 Dec 2025
Listing02 Jan 2026

Quota Reservation & Application Lots

Quota Reservation (% Shares)

Anchor13,77,600 shares
28.46%
QIB9,19,200 shares
18.99%
HNI6,89,600 shares
14.25%
Retail16,09,600 shares
33.26%
Market Maker2,44,000 shares
5.04%

Minimum Application Lots

Retail2 Lots (1,600 shares)
₹2,78,400
sHNI3 Lots (2,400 shares)
₹4,17,600
bHNI8 Lots (6,400 shares)
₹11,13,600

Company Promoters

Zephyr Mantra LLCVentureast ETOE LLPSourajit MukherjeeVinay Kunjuri Panduranga Rao

Company Background

E To E Transportation Infrastructure Limited, incorporated in 2010, is an ISO 9001:2015 certified company providing system integration and engineering solutions for the railway sector across mainline, urban transit, and private siding projects. The company offers end-to-end services including signaling and telecommunications, overhead electrification, track ...

Lead Managers & Bankers

Financial Performance

Figures in ₹ Crores
Metric Breakdown

Revenue

Latest (Sep-25)₹112.78 Cr
Growth-16.9%
Revenue Trend (₹ in Crores)
0.097.3194.6291.9Mar-23Mar-24Mar-25Sep-25
PeriodRev (Cr)PAT (Cr)AssetsDebt
Sep-25112.78-7.49310.84113.51
Mar-25253.8213.99295.4466.18
Mar-24172.510.26200.8961.18
Mar-23135.78.15145.1643.11

Key Performance Indicators (KPIs)

PeriodEPSROEROCEP/E (Pre)P/E (Post)
Sep-250-6.50%-1.23%00
Mar-25015.72%15.69%15.440
Mar-24015.67%15.68%00
Mar-23014.59%14.21%00

Peer Comparison & Valuation

Financial Performance

Ircon international

NAV/Share (₹)67.26
RONW(%)11.5
EPS (Basic) (₹)7.73

KEC International

NAV/Share (₹)200.88
RONW(%)10.67
EPS (Basic) (₹)21.80

Texmaco Rail & Engineering

NAV/Share (₹)70.02
RONW(%)8.90
EPS (Basic) (₹)6.24

E to E Transportation Infrastructure

NAV/Share (₹)93.47
RONW(%)12.39
EPS (Basic) (₹)11.58

Valuation

Ircon international

P/E(X)19.83
CMP* (₹)153.28
Face value (₹)2.00

KEC International

P/E(X)32.37
CMP* (₹)705.60
Face value (₹)2.00

Texmaco Rail & Engineering

P/E(X)16.78
CMP* (₹)104.70
Face value (₹)1.00

E to E Transportation Infrastructure

P/E(X)45.19
CMP* (₹)0
Face value (₹)10.00

Broker & Analyst Reviews

Review Not Available

Institutional broker reviews and analyst reports have not been released for this issue yet. Reviews are typically published 2 to 3 days prior to the issue opening date.

IPO Allotment & Registrar Status

Official Registrar: Link Intime India Private Limited

Allotment Finalized
Allotment Date
31 Dec 2025
Official Status
Out / Finalized
Registrar
Link Intime India Private Limited
Listing Date
02 Jan 2026

Official Allotment Verification Links

Official Registrar Portal
Link Intime India Private Limited

Direct allotment verification on the official registrar portal appointed for E to E Transportation Infrastructure. Check with PAN or Application No.

Check on Registrar Portal
Stock Exchange Portal
BSE India Investor Portal

Official Bombay Stock Exchange investor verification channel using Issue Name and PAN Number.

Check on BSE India

Allotment Schedule & Milestones

IST
1. Allotment Finalization31 Dec 2025Basis of allotment declared
2. Refund Initiation1 day post allotmentUPI / ASBA mandate unblocked
3. Demat CreditPrior to listingShares credited to CDSL/NSDL
4. Listing Date02 Jan 2026Trading commences on exchange

How to Check E to E Transportation Infrastructure Allotment Online

1Open Portal

Click on the official registrar link or BSE portal button above.

2Select Company

Select E to E Transportation Infrastructure from the issue drop-down list.

3Enter Details

Select PAN, Application No., or DP Client ID and type your details.

4View Allocation

Click Submit to check your allotted share count and status.

Prospectus & Official Filings

Allotment FAQs & Help

About E to E Transportation Infrastructure IPO

Complete issue overview for E to E Transportation Infrastructure (E2ERAIL) IPO. The issue features an equity share price band of ₹164 – ₹174 per share with a minimum retail lot size of 800 Shares (minimum application amount of ₹1,39,200). Explore live market tracking on our GMP Tracker, compare against All IPO GMP Today, or view category bidding on the Subscription Page. Verify official allotment via IPO Registrars or review participating investment bankers in our Lead Managers Directory.

Frequently Asked Questions